Our projects

OUR RECENT

COMPLETED PROJECTS

Tank Erection 23.4m (H) x 11.4m (DIA)

Nov 2024′ – Jan 2025

Domento was awarded the contract for the Erection of a stock tank at the
Enstra Paper Mill in Springs, South Africa. The project was executed in full compliance with API
650 standards, ensuring high-quality workmanship and adherence to international best practices.

LOCATION

Enstra Paper Mill,
Springs

CLIENT

Styria

MATERIAL: 304 Stainless Steel
THICKNESS: 16mm – 6mm
HEIGHT: 23.4 Meters
DIAMETER: 11.4 Meters

Sasol CF2 Large Tank Project

Sept 2024′ – Feb 2025

The Sasol Secunda CF2 Large Tanks project, a major construction project
for Sasol Synfuels Operations.

LOCATION

Secunda

CLIENT

Sasol / Prommac

  • Piping Shop Fabrication (Free-Issued Material)
  • Detailing of structural steel packages
  • Supply & fabrication of isometric specific pipe supports
  • Supply & fabrication of structural steel packages inclusive of all galvanised grating panels
  • Corrosion Protection of all prefabricated piping & structural steel assemblies.
  • Quality control and all other related functions
  • Transport

ACP Converter Phase B – Emergency Ring Repair

Aug 2024′ – Oct 2024

The Phase B Converter at Anglo Platinum’s ACP Plant in Rustenburg, South Africa, is scheduled for a ring rebuild in 2024 due to the furnace refractory’s condition and the campaign life duration.

LOCATION

Acid Converting Plant, Rustenburg

CLIENT

Anglo American

  • Demolition & Installation of Wall Refractory Course 20 to 9 and four rows of upper heart Bricks.
  • Demolition & Installation of the Matte Tap Blocks and Tapping channel modules.
  • Removal & Installation of the Belly Band,
  • Removal & Installation of the Upper and Lower Stave Coolers,
  • Removal & Installation of the Upper & Lower Waffle Coolers,
  • Removal and Installation of the Matte Launders,
  • Removal & Installation of the HP System.
  • Supply & Installation of the lagging & cladding,
  • Supply & Installation of Cooling Water and Plant Air Piping,

Sasol CF2 Large Tank Project

Sept 2024′ – Feb 2025

The Sasol Secunda CF2 Large Tanks project, a major construction project for Sasol Synfuels Operations.

LOCATION

Secunda

CLIENT

Sasol / Prommac

  • Piping Shop Fabrication (Free-Issued Material)
  • Detailing of structural steel packages
  • Supply & fabrication of isometric specific pipe supports
  • Supply & fabrication of structural steel packages inclusive of all galvanised grating panels
  • Corrosion Protection of all prefabricated piping & structural steel assemblies.
  • Quality control and all other related functions
  • Transport

Slag Cleaning Furnace No.1 Rebuild & Cooling Water Upgrade 2025

Jan 2025′ – Mar 2025

The Anglo-American Slag Cleaning Furnace (SCF) at the Waterval Metallurgical Complex in Northwest has historically been maintained on a biennial basis. The objective of the SCF1 Rebuild planned for January 2025 is to partially replace the Full Ring and skews of the furnace by demolition of all refractory and subsequent components from within the furnace and replacing them with new refractory and components.

LOCATION

Waterval, Rustenburg

CLIENT

Anglo American

  • Supply, jacking, securing, and alignment of furnace roof and upper mantle, including demolition and installation of refractory lining (Courses 23–30)

  • Installation and replacement of small bore piping, flexible hoses, copper piping, and gravity return cooling water lines

  • Removal and installation of furnace transition piece, matte and slag launders, and tundish extension boxes

  • Civil works and installation of new emergency diesel pumps, including suction and discharge lines

  • Loading of furnace start-up charge and modifications to Main Tank TK-001

Three new Temporary Chimney’s & Horizontal Ducting

Mar 2023′ – Sep 2023

Domento was awarded the contract in March of 2023 for the supply, fabrication and erection of the  3 new x temporary chimney’s at Kusile power station, the stack is free-standing circular in shape and reach a staggering 116 meters in height, Domento was awarded additionally the horizontal ducting that interconnects the existing ducting to the new stacks.

SCOPE

Detail/Design, Supply, Manufacture, Deliver and Erection of the 3 x Temporary Stack’s and 3 x Horizontal Ducting.

LOCATION

Kusile Power Station, Delmas, Mpumalanga, South Africa

CLIENT

ESKOM & CONCOR

3 x Temporary Stack’s

Platework: 1 706 Tons

Structural Steel: 118 Tons

Bolts: 26 000 off

3 x Horizontal Ducting

Platework: 125 Tons

Slag Cleaning Furnace No. 1 Rebuild – CM006

June 2022 – Apr 2023

The existing slag cleaning furnace No. 1 (SCF1) at Anglo Platinum’s Waterval Smelter Plant in Rustenburg South Africa, is required to be rebuilt during 2022 based on the campaign life duration and condition of the furnace shell.

SCOPE

Rebuild slag cleaning furnace No. 1 (SCF1) at Anglo Platinum’s Waterval Smelter 

LOCATION

Waterval Smelter, Rustenburg

CLIENT

Anglo American & GLPS

Furnace Steel: 318.5 Tons

Free-issued Mechanical Equipment: 189.7 Tons

Structural Steel: 148 Tons

Platework: 49.9 Tons

Small Bore Piping: 10, 740 Meters

Large Bore Piping: 905 Meters

Copper Piping: 748 Meters

6IL Furnace Piping Rebuild – EB17000

June 2022 – Sep 2023

A Total Rebuild of the 6iL Furnace will take place, which includes replacement of the Low-Pressure Cooling Water Small Bore & Large Bore Piping to 6iL Furnace cooling elements and replacement of 14 LPCW Tundishes.

SCOPE

Demolition of existing furnace cooling Small Bore and Large Bore Cooling Piping and Tundishes.

LOCATION

Polokwane, Limpopo, South Africa

CLIENT

Anglo American

Small Bore Piping: 8, 840 Meters

Large Bore Piping: 1, 649 Meters

Tundishes: 14 off

BMR Expansion & Debottlenecking Project – CM001

July 2021 – May 2022

Expansion on the BMR Plant for Spent Cooling, Se/Te , Vacuum Pan Dryers Centrifuge and Crystalliser area’s.

SCOPE

Supply, Fabrication and Erection of Structural Steel gantries, Workshop Structure, Piping and Mechanical Components.

LOCATION

Northam Platinum Smelter Zondereinde

CLIENT

Northam Platinum & WOOD PLC

Piping: 2 700 Meters

Platework C/S: 20 Tons

Platework S/S: 40 Tons

Structural: 25 tons

Wrap Around & EMP 0,1,2 Hygiene Integrity Upgrade – CM002

Apr 2021 – Feb 2022

  1. Fabrication Artisans: 34
  2. Erection Artisans: 82
SCOPE

Supply, Fabrication and Erection of Structural Steel gantries, furnace building extension, Primary & Secondary Ducting and Furnace Cooling Piping.

LOCATION

Northam Platinum Smelter Zondereinde

CLIENT

Northam Platinum Smelter Zondereinde

Piping: 2 700 Meters

Platework C/S: 180 Tons

Platework S/S: 30 Tons

Structural: 163 tons

Furnace 1 Integrity Rebuild – 6 Inline Furnace Rebuild

May 2021 – Oct 2021

  1. Erection Artisans Day Shift: 110 off
  2. Erection Artisans Night Shift: 53 off
SCOPE

Complete Installation of new 6-inline furnace steel, Electrodes , wrap around structural steel structures, Platforms and Hydraulic Piping

LOCATION

Northam Platinum Smelter – Zondereinde

CLIENT

Northam Platinum Smelter – Zondereinde

Northam Platinum

Northam Platinum

Jul 2019 – Sep 2019

We, at Northam, did a complete demolition and instillation of the furnace roof, removal and instillation of the off gas, and maintenance of on the maxi coolers on the furnace shell.

LOCATION

Northam Zondereinder (Smelter)

SCOPE

Off-gas and furnace roof replacement

Tenova Pyromet

June 2016 – Dec 2017

Our team did the complete Supply, fabrication, and erection of the:

  • Furnace Shell,
  • Grillage beams,
  • Furnace roof,
  • Off gas,
  • Furnace fume extractor ducting
  • And as well as all the large, and small bore piping.  
LOCATION

Northam Zondereinder (Smelter)

SCOPE

A complete new MW Furnace project

Anglo American

Anglo American

Jan 2018 – Feb 2018

We did the demolition of existing piping and instrumentation, and the full instillation of the new piping (leak detection).

 

LOCATION

ACP Rustenburg

SCOPE

ACP leak detection, and piping instillation

African PPS

Jan 2017 – Dec 2017

The complete supply, fabrication, and erection of interconnection of the piping, structural steel, and Shell plates of the tanks. We also fabricated and installed the Floor plates and roof plates of the Tanks.  

LOCATION

Moatize, Mozambique

SCOPE

Bulk Fuel Tanks and Piping